Let's Get Started On Your Project

Start Project

Projects

Startec Service

Sobeys Rockyview Distribution Center

Sobeys Rockyview Distribution Center Service

Sobeys Inc. is Canada’s second largest food retailer with approximately 1,500 stores under retail banners that include Sobeys, Safeway, IGA, Foodland and Thrifty Foods. Startec was contracted to install a new Crossdock Refrigeration system in the Sobeys newly acquired Rockyview Distribution Center. Despite a short timeline, Startec executed the project flawlessly and completed the project on time and budget.

View Project
Refrigeration Distribution Center - Acheson, AB

Refrigeration Distribution Center - Acheson, AB Service

Startec was contracted to install a new Refrigeration System in a recently built Alberta Distribution Center in Acheson, AB.

View Project
Freson Bros Produce and Healthy Foods Store Upgrade

Freson Bros Produce and Healthy Foods Store Upgrade Service

Freson Brothers is the largest family-owned independent grocery chain in Alberta. When planning a new Healthy Foods section in their Brooks store, they called Startec. The project scope included rearranging the existing produce display line up, plus the addition of one dairy case and one freezer case.

View Project
Giant Mine Modular Portable Refrigeration System

Giant Mine Modular Portable Refrigeration System Service

Located in Yellowknife NWT, Giant Mine produced about 7.6 million oz. of gold before going bankrupt and leaving behind a very large environmental problem - 237,000 tonnes of toxic arsenic trioxide dust. After years of study on how to safely remove the environmental hazard, it was concluded that the safest way to handle the potential deadly and dangerous effects of the arsenic dust was to freeze it in place — forever.

View Project
Penhold New Arena Design and Construction

Penhold New Arena Design and Construction Service

Startec has equipped the Penhold Regional Multiplex with the optimal level of cost effectiveness and energy efficiency. The Town of Penhold commissioned us to design the ice plant for the new building, which includes a hockey arena, library, fitness club and other community facilities.

View Project
Cargill Beef Processing Plant

Cargill Beef Processing Plant Service

Startec is an important contributor to the success of the Cargill Meat Solutions plant in High River, Alberta. Over the past 15 years, we’ve managed the maintenance of sophisticated refrigeration systems and led two successful expansion projects, which more than doubled the capacity of the integrated beef processing facility.

View Project
Olymel Pork Production Plant

Olymel Pork Production Plant Service

Startec has played major role in the creation and operation of Western Canada's largest pork processing facility. In 2005, we led the design and construction of a major expansion project that doubled the capacity of Olymel's Red Deer pork processing plant. The facility can now process up to 18,000 hogs per day.

View Project