Bonavista Energy Gas Plant

Compression & Process

Ansell (65 MMSCFD)

Ansell, AB

Startec worked directly with Bonavista Energy on process design and defining scope of the plant — no engineering company was involved. The Ansell project was successfully delivered on time with approximately 0.8% change from the original contract price.

Basic Description of Equipment Provided
  • One (1) 100MMSCFD Low Temp (-30°C LTS) Liquids Recovery Plant c/w a 72 ID” x 180” Low Temperature Separator
  • Two (2) 800hp Engine Drive Screw Refrigeration Compressor Packages
  • One (1) x 100% 125 HP Baldor Electric Drive, Ariel JGQ/2 -1 Sweet Gas OH Compressor Package
  • Shipped loose and mounted off-skid:
    • Two (2) Gas-Gas heat exchanger bundle
    • One (1) Gas-Liquid heat exchanger
    • One (1) 72” ID X 360” S/S Low Temperature Separator
    • One (1) 48” ID X 360” S/S Propane Accumulator
    • One (1) C3+ Product Air Cooler
    • One (1) Propane Condenser/CLOW Air Cooler