
High CO2 & Water Content For the Argentina Casing Gas project, Startec designed, fabricated and commissioned ... > Details
Significant Environmental Challenges The Pakistan Petroleum Limited (PPL) Adam X-1 Hala Early Production Facility project involved ... > Details
40+% H2S 15 High-Spec Compression Packages A top ten global petroleum producer came to Startec with a ... > Details
| Application | Dew Point Control Plant |
|---|---|
| Client | El Wastani Petroleum |
| Location | Egypt |
| Oil & Gas | Processing |
| Size | 800 - 850 HP |
The Egypt Dewpoint Control Plant project involved a large gas processing plant in a desert location with high ambient temperatures prone to high winds and sandstorms.
The project demonstrates Startec's proven capabilities in:
To discuss the specifications of your dewpoint control projects, contact a Startec Oil & Gas Customer Representative at 403.295-5855 or toll free at 1-800-555-9439