
Demanding Desert Location The Egypt Dewpoint Control Plant project involved a large gas processing plant in ... > Details
Managing Ultra Low Pressures The Milo project required the recovery of natural gas emitted from oil ... > Details
40+% H2S 15 High-Spec Compression Packages A top ten global petroleum producer came to Startec with a ... > Details
| Location | Milo, Alberta |
|---|---|
| Client | Husky Oil |
| Application | Vapor Recovery Compression |
| Compressor Manufacturer | Howden WRVi series |
| Oil & Gas | Compression |
| Method | Screw Compression |
| Size | 150-200 HP |
The Milo project required the recovery of natural gas emitted from oil stored in a tank farm. The gas had a very low flow rate and a high molecular weight, making it prone to condensation. The condensation issues were complicated by the wide ambient temperature range at the facility.
The unique technical demands of the project required the design of a highly precise, multiphase measurement and control system.
The Milo project demonstrates Startec's proven capabilities in:
While the vapour recovered in the Milo project was sweet gas, Startec also provides vapour recovery solutions for sour gas.
To discuss the specifications of your vapour recovery projects, contact a Startec Oil & Gas Customer Representative at 403.295-5855 or toll free at 1-800-555-9439